t-town's Building process

 

 

Process for building a New Home:

 

  1. Get financing lined up
  2. Select a builder
  3. Select or design a plan
  4. Outline specifications
  5. Draw up contract- Submit to lender

 

 

The Build Process Will Include:

 

  1. Prep the pad
  2. Dig and pour stem walls
  3. Plumb the slab
  4. Frame House
  5. Roof House
  6. Top out Plumbing
  7. Wire the House
  8. Rough in Heat and Air
  9. Insulate
  10. Sheet rock
  11. Trim
  12. Tile Floors
  13. Cabinets
  14. Paint
  15. Fixtures Plumbing and Lighting
  16. Counter tops
  17. Showers /Tubs
  18. Final Plumbing
  19. Final Electric
  20. Driveway and Sidewalks
  21. Final Clean

 

This is the usual order, however, availability of subs sometimes forces a last minute change.

 

 


T-Town Construction PO Box 68 Owasso, OK 74055
Phone: Cell:

Staff Profiles | Contact Us | Download Adobe Acrobat | Our Featured Homes | Home | Loan Application Checklist | Loan Programs | Mortgage Shopping | Locking in Rates | APR Calc | 15 vs 30 Year Mtg Calc | ARM vs Fixed Rate Calc | Maximum Mortgage Calc | Mortgage Calculators | 9 Steps to Ownership | How to Sell Your Home | Staging Your Home | Customer Testimonials

Copyright © 2010 T-Town Construction
Portions Copyright © 2010 a la mode, inc.
Another XSite by a la mode, inc. | Admin LoginTerms of UseSite Map
All rate, payment, and area information are estimates and approximations only.